At approximately 9:15AM, power was restored to the pods that were affected by the internal circuit breaker trip noted earlier.
Please send email to mghpcc-management at mghpcc.org if you have questions or need us to do any work on site.
Apologies for the outage.
-------9:01AM December 18, 2023------
The MGHPCC main meter detected two ITIC Level 4 power sag events at 6:39AM on Monday December 18. The power sag affected all non-UPS systems in the data center
The sag caused a circuit breaker inside the data center to trip, leaving power down on the following pods:
Row 3 Pod A
Row 4 Pod A, B (odd side), and C
Row 5 Pod A and C
Row 7 Pod C
Row 8 Pod C
Row 9 Pod C (odd side)
Row 8 Pod A
We are working to restore power as soon as safety checks are done, and double-checking the status of all other pods.
Details
Date: Monday December 18, 2023
Time: 6:39AM
First event
Percent of Nominal: 34%
Duration: 4 cycles
Second Event
Percent of Nominal: 36%
Duration: 5 cycles