[Op1st-dc-alerts] [mghpcc-alerts] MGHPCC Electrical Work - Holyoke, MA
Crown Castle Fiber Change Mgmt
FiberChangeMgmt at crowncastle.com
Thu Apr 25 06:55:32 EDT 2024
Subject: Request to Verify Event Start/End Time - MGHPCC Electrical Work - Holyoke, MA
Dear MGHPCC,
I hope this message finds you well. I am writing to kindly request verification on whether the event has commenced or concluded as per the scheduled time.
Could you please confirm whether the event has started as scheduled? Your prompt response would be greatly appreciated.
Please advise as soon as possible.
Thanks ahead of time,
Raul Acero
Change Control Technician
T: (561) 464-4193
CROWN CASTLE FIBER
3605 NW 82nd Ave, Miami, FL 33166
Fiber.CrownCastle.com
Contractors will be performing a routine state-required inspection of both the personnel and freight elevators in the MHGPCC data center in Holyoke MA. The inspection includes a transfer of facility load to generator power for approximately 30-60 minutes to confirm that the elevators can operate during a utility power outage.
This email may contain confidential or privileged material. Use or disclosure of it by anyone other than the recipient is unauthorized. If you are not an intended recipient, please delete this email.